San  Jacinto Hall

Construction Updates

We'll be posting all of the updates about our new reception building, San Jacinto Hall, on this page, on our social media, and through our construction updates e-mail campaign! 

 

The Coronavirus pandemic did push our start date back but we are still on schedule to open with our first wedding in the new building on March 14, 2021. While this is a scary and exceptionally uncertain time for everyone, we are excited to be taking this huge step forward for our small family business.

 

​Feel free to sign up for our e-mail list to get construction updates sent directly to your inbox!  We will be scheduling special days for hard hat tours along the way and will obviously be throwing one heck of a grand opening party when it's finished! Be sure to keep an eye out here and on our social media!

Opens In:

8.14.20 Pad site built up

8.7.20 Digging out the Fire Lane

8.6.20 Vendor and handicap parking area

8.6.20 New parking area

8.5.20 Building dug out (Facing West)

8.4.20 Dirt work starting.

7.31.20 Building staked out. Facing south.

8.14.20 Bringing gravel in for the new parking lot

8.7.20 New parking lot dug out

8.6.20 Circular drive for covered drop off

8.5.20 New gate entrance cutout

8.5.20 Building dug out (Facing East)

8.1.20 New gate location. Facing south.

7.31.20 Building staked out. Facing west.

Keep an eye out for more updates here, on social media, or sign up for our e-mail list to have them sent directly to your inbox!

Share

With US

  • Facebook Social Icon
  • Instagram Social Icon
  • Pinterest Social Icon
  • Twitter Social Icon
  • Snapchat Social Icon
  • Google+ Social Icon

CONTACT

US

Call or Text: 281-943-4244

E-Mail: info@townhalltexas.com

12194 Sleepy Hollow Road

Conroe, TX 77385

*Tours by appointment only*

*Closed Mondays*

MESSAGE

US

Complete

Our

Contact

form